logo GRT GAZGRT gaz - build the transport of tomorrow
La revue soGaz #3
Le Gaz. L'Énergie des Possibles. - 10 new reports to discover

Operational network code

In case of display problem, please click to refresh the page.

General information

Part Version Type

Part A2 - Technical requirements applicable to GRTgaz’s transmission pipelines and to gas transmission, distribution and storage installations connected to the grtgaz network.

Part A2

01/04/2018

Binding

Part A2

01/04/2017

Binding

Part A2

01/04/2015

Binding

Part A2

01/11/2011

Binding

Management of the upstream capacities

B1- Determining upstream capacity

Part Version Type

B1.1 - Method for determining upstream capacity

Part B1.1

01/04/2017

For information

Part B1.1

01/10/2012

For information

B3- Availability of the upstream capacities:

Part Version Type

Part b3.1 – Conditions of capacity availability at the entry/exit points of GRTgaz's Transmission System outside enginneringwork periods

Part B3.1

02/09/2019

Binding

Part B3.1

01/04/2019

Binding

Part B3.1

10/12/2018

Binding

Part B3.1

01/11/2018

Binding

Part B3.1

01/06/2018

Binding

Part B3.1

01/04/2018

Binding

Part B3.1

01/12/2017

Binding

Part B3.1

01/11/2017

Binding

Part B3.1

01/04/2017

Binding

Part B3.1

01/11/2015

Binding

Part B3.1

01/04/2015

Binding

Part B3.1

01/11/2014

Binding

Part B3.1

01/04/2012

Binding

Part B3.1

01/11/2011

Binding

     

B3.2 – Interruption of upstream network interruptible capacity

Part B3.2

01/11/2018

Binding

Part B3.2

01/04/2017

Binding

Part B3.2

01/10/2015

Binding

Part B3.2

01/04/2015

Binding

Part B3.2

01/11/2011

Binding

     

B3.3 – Interruption of upstream network interruptible capacity

Part B3.3

01/04/2017

Binding

Part B3.3

01/10/2015

Binding

Part B3.3

01/04/2015

Binding

Part B3.3

01/04/2013

Binding

     

B3.4 – Buy back Procedure

Part B3.4

01/04/2017

Binding

Part B3.4

01/10/2013

Binding

     

B3.5 – The allocation of capacity between the North-South link and PITS Nord Atlantique and Sud Atlantique

Part B3.5

01/11/2018

For information

Part B3.5

01/04/2017

For information

Part B3.5

01/04/2015

For information

Part B3.5

01/04/2014

For information

Downstream capacity management

C3-Availibility of downstream capacities

Part Version Type

Part C3.2 – Procedure for the interruption of daily transmission capacity on the regional transmission and delivery systems - option 1

Part C3.2

01/11/2018

Binding

Part C3.2

01/04/2017

Binding

Part C3.2

01/04/2015

Binding

Part C3.2

01/11/2011

Binding

     

Part C3.3 – Procedure for the interruption of daily transmission capacity on the regional transmission and delivery systems option 2

Part C3.3

01/11/2018

Binding

Part C3.3

01/04/2017

Binding

Part C3.3

01/04/2015

Binding

Part C3.3

01/04/2012

Binding

Part C3.3

01/11/2011

Binding

     

Part C3.4 – Interruption of regional network interconnection points (pirr) daily transmission capacities

Part C3.4

01/04/2017

Binding

Part C3.4

01/10/2015

Binding

Part C3.4

01/04/2015

Binding

Part C3.4

01/11/2011

Binding

     

Part C3.5 – Procedure for the interruption of daily transmission capacity subscribed on optional short notice interruptible service

Part C3.5

01/11/2018

Binding

Part C3.5

01/02/2018

Binding

Part C3.5

01/04/2017

Binding

Part C3.5

01/04/2015

Binding

Part C3.5

01/04/2012

Binding

Part C3.5

01/11/2011

Binding

Forecasts - Nominations - Scheduling - Quantities

E1-Forecast Nominations Schedules:

Part Version Type

PART E1.1 – Forecasts and nominations

Part E1.11

01/11/2018

Binding

PART E1.1 – Forecasts and nominations

Part E1.11

26/10/2017

Binding

Part E1.11

01/04/2017

Binding

Part E1.11

01/10/2015

Binding

Part E1.11

01/04/2015

Binding

Part E1.11

01/04/2013

Binding

Part E1.1

01/04/2012

Binding

Part E1.1

01/11/2011

Binding

     

Part E1.2 – Scheduling on title transfer points

Part E1.2

01/04/2017

Binding

Part E1.2

01/04/2016

Binding

Part E1.2

01/04/2015

Binding

Part E1.2

01/04/2015

Binding

Part E1.2

01/11/2011

Binding

     

Part E1.3 – Scheduling except on title transfer points

Part E1.3

01/04/2019

Binding

Part E1.3

01/11/2018

Binding

Part E1.3

01/04/2018

Binding

Part E1.3

01/12/2017

Binding

Part E1.3

26/10/2017

Binding

Part E1.3

01/04/2017

Binding

Part E1.3

01/04/2016

Binding

Part E1.3

01/11/2015

Binding

Part E1.3

01/04/2015

Binding

Part E1.3

01/04/2013

Binding

Part E1.3

01/04/2012

Binding

Part E1.3

01/11/2011

Binding

Indicator

Part Version Type

Utilisation of interruptible capacity North South link indicator

Indicator

19/06/2013

Non-binding